Bathroom Renovation Timeline Sydney: How Long Does a Renovation Really Take?
- Mr Bathrooms

- Nov 15
- 3 min read
Bathroom renovations in Sydney usually take 3–5 weeks, but the exact timeframe depends on the size of the bathroom, the materials you choose, and how complex the job is. If you’re planning your renovation and want to know what to expect, this guide breaks down the process week-by-week so you can feel confident from start to finish.
Whether you live in a unit, townhouse, semi, or a freestanding home, this timeline will help you understand what actually happens behind the scenes and why choosing the right renovation team makes all the difference.

⏱ Typical Sydney Bathroom Renovation Timeline
A standard bathroom renovation in Sydney generally falls into one of these timelines:
Small or basic bathroom: 2–3 weeks
Standard mid-range bathroom: 3-4 weeks
High-end or complex bathroom: 3–4 weeks
Apartment/strata bathroom: 3–4+ weeks (approvals can add time)
The construction itself is usually consistent the real differences come from materials, waterproofing, plumbing complexity, and how many trades are required.
📅 Bathroom Renovation Timeline Sydney: How Long Does a Renovation Really Take?
Week 1 - Strip Out, Plumbing & Electrical Rough-In
This is the fastest but messiest part of the project.
What happens:
Full strip out of old tiles, walls, vanity, bath, shower, toilet
Removal of old waterproofing
Inspecting the slab and walls for any hidden damage
Plumbing rough-in (water pipes, mixer placements, drains)
Electrical rough-in (lights, power points, LED mirrors, fans)
Time:
3–5 days
What can add time:
Discovering water damage
Rotting timber
Render work
Weak concrete slab
Incorrect existing plumbing
Asbestos (only in older Sydney homes)
Week 2 - Waterproofing & Screeding
This week is where the foundation of your bathroom is created.
What happens:
Applying primer
First waterproofing coat
Drying time
Second waterproofing coat
Screed installation
Levels prepared for tiling
Time:
3–4 days
Note:
Australian standards (AS3740) require strict drying times, so this week is usually unavoidable. Cutting corners here causes leaks later.
Week 3 - Tiling
This is the most visually exciting part.
What happens:
Wall tiling
Floor tiling
Grouting
Silicone sealing
Feature walls or niches added
Time:
5–7 days
What affects timing:
Large-format tiles (600x600, 750x1500, slabs)
Natural stone
Herringbone or finger tiles/kit-kat tiles
Complex waterproofing areas
High-end tile patterns = more time.
Week 4 - Fit-Off & Finishing Touches
Once tiling is complete and cured, everything comes together.
What happens:
Install vanity, tap-ware, mixers
Shower screen installation
Mirror/shaving cabinet
Toilet installation
Accessories (towel rails, hooks, niches)
Painting
Final silicone
Full inspection
Time:
3–5 days
Most bathrooms are ready to use within 3–5 weeks, depending on complexity.
🧱 What Makes a Renovation Take Longer in Sydney?
Certain factors can push a bathroom renovation into the longer end of the timeframe:
✔ Strata approval delays
Townhouses and apartments often require formal approvals.
✔ Custom cabinetry
Custom vanities, stone tops, and custom shaving cabinets add lead times.
✔ Feature tile selections
Mosaics, natural stone, and large-format tiles take longer to install.
✔ Waterproofing cure time
Cannot be rushed legally must dry properly.
✔ Site access
Units with limited lift access or street parking take longer.
✔ Plumbing relocations
Moving toilets, showers, or vanities extends Week 1 significantly.
📍 Sydney-Specific Considerations
The Sydney market has unique challenges compared to other states:
Many homes are older, meaning more hidden water damage
Apartment plumbing stacks can restrict layout design
Tight spaces are common in inner Sydney suburbs
Weather can affect waterproofing and tiling drying time
Tradie availability varies by suburb
That’s why choosing an experienced local renovator matters.
👷♂️ How Mr Bathrooms Keeps Your Renovation On Schedule
At Mr Bathrooms Sydney, we follow a streamlined construction timeline designed to keep every project moving smoothly:
✔ Reliable, experienced in-house trades
No delays from random subcontractors.
✔ Fast communication
We update you at every stage, daily.
✔ Strict waterproofing compliance
We follow AS3740 waterproofing standards and mandatory drying times.
✔ Clean, organised job sites
No time wasted fixing avoidable mistakes.
✔ Detailed planning before starting
Tile selection, fixtures, and layout are finalised before demolition preventing mid-reno delays.
This is how we consistently deliver high-quality renovations within 3–5 weeks, even in complex homes.
📞 Thinking About Renovating Your Bathroom in Sydney?
At Mr Bathrooms, we’ve renovated hundreds of homes across Sydney apartments, semis, freestanding houses, and luxury bathrooms.
If you’re ready to transform your space:
👉 Visit: www.mrbathrooms.com.au
👉 Call us: 0414 373 718
👉 Request your free quote today
A beautifully built bathroom is only a message away.




Comments